Skip to content
Documentation

Manager: first day

Check daily figures, health, tasks and farm costs.

Last updated 2026-10-23

Manager: first day

Start with today's missing figures, health warnings and overdue work.

What to do

  1. Check Lots. Open /lots/list; place new flocks or egg sets at /lots/new.
  2. Check daily records. Review mortality, feed and layer eggs. Fix missing figures before reading performance reports.
  3. Check health. Open /health. Active withdrawal blocks sale or harvest unless an authorized, audited override applies.
  4. Assign work. Open /tasks; attach an SOP where needed. Planning > Review shows overdue work, problems and the last week's completions.
  5. Record money. Use sales and expenses. For Feed purchases, check whether delivery entered stock or went directly to a Lot. Review totals and shares before confirming.
  6. Review Feed gaps. Manual capture records measured feed. After changing date, wait for the day's context to load. Historical previews up to 31 days across scheduled Lots and confirms online; Automation controls daily generation per Lot. Check birds, phase, stock and cost first.
  7. Record Broiler weights. Use Lots > Weight round, select Lots and date, enter grams, review and confirm. Retry rejected samples only. Layer weights stay on each Lot's capture/Growth screen.

Watch out

  • Sort eggs with a sale when needed. Bird sales need the physical Lot and grade.
  • Farm egg count differences and all harvested-bird counts need review. A stock count never restores live birds. See count differences.
  • Schedule templates need titles and whole-number days; day 0 is placement. Feed templates check phase ranges and limits. Drafts restore on this device; do not resubmit Queued offline templates. See Tasks and SOPs.
  • Corrections keep their history. Missing screens may need an Owner to change your role or plan. Use /onboarding for remaining setup tasks.